Case Studies
Let Us Inspire You
Welcome to our Case Studies page. Here we showcase of a selection of real installations that highlight how our products perform in practice. Each case study offers a closer look at the challenges faced, the solutions implemented, and the results achieved—demonstrating the quality, reliability, and versatility of our products across a range of applications. Explore these projects to see how our solutions are successfully installed and trusted in the field.
If you wish to submit a project to be featured in a case study, please reach out to our team below, we would love to showcase your work!
Our Case Studies
Garage Doors
Sectional Garage Doors
Step by Step installation guide for Sectional Garage Doors
Product Name: Large Rib, ISO 45 EVO Sectional Garage Door
Location: Bolton, Greater Manchester
In this project, a Novoferm UK recommended trade partner, successfully delivered an installation of a ISO 45 Sectional garage door at their customers site in Bolton. The end user was interested in a new garage door to be installed onto their premises. The clients needs reflected an easy operation solution, top insulation properties due to the clients use of the garage space, with high security features all whilst maintaining high levels of functionality for many years to come.
After our trade customer introduced the end user to our full range of garage doors, the preferred choice was a Novoferm UK Double size, Large Rib ISO 45 EVO, in a very popular colour choice of Agate Grey, RAL 7038. The ISO 45 EVO boasts a 45mm thickness insulation and provides even more benefits such as its space-efficient design, smart home compatibility and connectivity, weather sealed protection plus customisation options for project-specific requirements with a variety of glazing options and colour finishes available.
Sectional garage doors continue to be a leading choice across residential projects. Our insulated sectional garage doors are engineered with all in mind offering dependable components and precise manufacturing.
Click HERE to view an approved trade partner providing a clear, sectional garage door step-by-step overview of how our products are designed to fit efficiently and perform reliably on site. This installation highlights the practical benefits trade professionals value most: consistent quality, straightforward fitting and a premium finished result that meets customer expectations.
Up and Over Garage Doors
Step by Step installation guide for Retractable Up and Over Garage Doors
Product Name: Berwick, Retractable Up and Over Garage Door
Location: Walsall, West Midlands
In this project, a Novoferm UK recommended trade partner, successfully delivered an installation of a Berwick, Retractable Up and Over at their customers new build site in Walsall. This installation completed the plot, finalising a new build estate with a uniform look across all premises. The clients needs reflected an easy operation solution, automation due to the clients needs for added convenience, plus security and safety features all whilst maintaining high levels of functionality for many years to come.
After our trade customer introduced the end user to our full range of garage doors, the preferred choice was a Novoferm UK , Berwick Retractable Steel Up and Over, in a very popular colour choice of Agate Grey, RAL 7038. The Berwick boasts a vertical rib design with two sets of glazing at the top of the door design on each door leaf. All Novoferm glazing is made of weather-resistant acrylic glass or impact-resistant polycarbonate. Our glazing options are a great addition or feature of our door designs, providing extra added light into the garage, which could be required for the customers needs for instance a workshop, converted office, gym or other needs.
Up and Over doors continue to be a leading choice across residential projects. These doors offer a classic and reliable solution, effortless operation and a compact design ideal for modern homes
Click HERE to view an approved trade partner providing a clear, Up and Over garage door step-by-step overview of how our products are designed to fit efficiently and perform reliably on site. This installation highlights the practical benefits trade professionals value most: consistent quality, straightforward fitting and a premium finished result that meets customer expectations.
Industrial Doors
High Speed Industrial Doors
New state of the art high speed door for Kannegiesser, Banbury
Project Name: Kannegiesser
Location: Banbury, Oxfordshire
In this project, our group partner, BGS, successfully delivered an installation of a high speed industrial door for the industrial equipment supplier, Kannegiesser, at their site in Banbury. The Kannegiesser team were interested in a new state of the art high speed door installed onto their premises. The clients' needs reflected an easy operation solution that would maintain high levels of functionality for many years to come including withstanding heavy use throughout the course of a working day without operation efficiency decreasing.
After introducing the client to a wide range of high speed doors making recommendations on models that would be suitable for their needs. Upon confirmation, the BGS team coordinated closely with the client to make sure that the installation work could be completed at a time that would not be disruptive to everyday Kannegiesser’s business practices.
Post installation, the BGS team carried out thorough testing on the door after installation to make sure the door was operating correctly as well as providing extensive maintenance advice with the client to keep their high-speed door in the best possible condition. Overall, the Kannegiesser team was left wholly satisfied with the highly functional high-speed door that we installed from scratch.
Industrial Sectional Overhead Doors
Enhancing Operational Infrastructure at Tidworth Tank Storage Facility
Project Name: ALI 013 Tank Storage Unit
Location: VCP2 Army Base, Tidworth, Wiltshire
In this project, our group partner, BGS, successfully delivered an installation of 18 manual sectional overhead industrial doors as part of a refurbishment project on a tank storage facility in Tidworth. The scope included six sectional doors incorporating integrated personnel pass doors. Finished in a Carmine Red powder coating, providing these doors with a distinctive appearance similar to those commonly installed at fire stations.
As the project formed part of a live construction site, strict compliance with site-specific health and safety procedures was essential. Engineers adhered to approved method statements and risk assessments throughout the works and maintained the required standards, including the use of five-point PPE and valid CSCS certification. The Novoferm Group including BGS places safety, quality and compliance at the forefront of every project. This commitment is supported by a range of industry-recognised accreditations, including Constructionline Gold, CHAS, SafeContractor, ISO 9001 and ISO 45001, with ISO 14001 currently in progress.
Through effective planning, coordination and collaboration with the principal contractor and other trades on site, BGS successfully completed the installation of all 18 doors within the allocated programme, contributing to the successful delivery of the wider refurbishment project.
Supporting Operational Efficiency at Scania, Aberdeen
Project Name: Scania, Aberdeen
Location: Aberdeen, Scotland
In this project, our group partner, BGS, successfully delivered an installation of 7 sectional overhead industrial doors as part of a refurbishment project for Scania at their Aberdeen depot. The site required reliable, high-duty doors capable of supporting continuous workshop operations and controlling the movement of large commercial vehicles. These products were essential to support daily operation whilst maintaining efficiency. Replacing all seven doors was the most effective way to reduce the risk of any business downtime to ensure the could continue working at full capacity. The team managed the project from initial assessment through to installation, ensuring the new doors were fitted safely and with minimal impact on site operations.
Through effective planning, coordination and collaboration, the BGS team carried out site visits before installation planning how the doors would be delivered, offloaded and stored safely and correctly, working alongside Scania directly ensuring that only one bay was affected at any point to limit or restrict interruption to working or blocking off any access routes. This allowed the installation to be completed safely and efficiently with minima disruption
As the project formed part of a live construction site, strict compliance with site-specific health and safety procedures was essential. Engineers adhered to approved method statements and risk assessments throughout the works and maintained the required standards.
Delivering transformative solutions to enhance industrial spaces at Scania, Stansted
Project Name: Scania, Stansted
Location: Stansted, London
In this project, our group partner, BGS, successfully delivered an installation of a number of sectional overhead industrial doors as part of a refurbishment project for Scania at their Stansted depot. Upon inspection, the existing sectional doors were not just worn out but they also restricted the flow of natural light into the workshops, creating a dim work environment lacking the vibrancy needed for optimal productivity.
BGS, addressed this challenged and embarked on replacing the current obsolete products with new sectional overhead doors, with the primary objective of introducing more natural light into the workshops, transforming the ambiance and boosting the efficiency of daily operations.
The enhanced lighting conditions have the potential to improve employee morale, reduce energy costs and ultimately contribute to a more sustainable work environment. BGS don't just replace doors; they reimagine workspaces. This project showcases the dedication to innovative solutions that elevate industries and provide tangible benefits.
Industrial Roller Shutter Doors
Replacing a Corrosion-Damaged Industrial Roller Door at Cawdor Barracks
Project Name: Cawdor Barracks, Haverfordwest
Location: Haverfordwest, Wales
In this project, our group partner, BGS, successfully delivered an installation of an industrial roller shutter door for Cawdor Barracks in Haverfordwest, Wales. The team were originally contacted to survey and assess the condition of their current industrial roller shutter which had sustained rust and wind damage. Upon assessment, it was evident that the corrosion damage was too severe and therefore any repair work was no longer an option, necessitating the installation of a new industrial roller shutter door. The new product had to be rust-resistant, able to withstand strong winds, and highly durable, to ensure long-term functionality and reliability.
After introducing the client to a wide range of industrial roller shutter doors, BGS coordinated and scheduled the installation across two days avoiding any interruptions to the client’s day to day operations.
Post installation, the BGS team carried out thorough testing on the door after installation to make sure the door was operating correctly as well as providing extensive maintenance advice with the client to keep their industrial roller shutter, in the best possible condition.
Restoring Critical Access at Lancashire Teaching Hospitals
Project Name: Lancashire Teaching Hospitals, NHS Foundation Trust
Location: Royal Preston Hospital, Lancashire
In this project, our group partner, BGS, successfully delivered an installation of an industrial roller shutter door for Lancashire Teaching Hospital situated at Royal Preston Hospital. The team were originally contacted to survey and assess damage to their existing industrial roller shutter. Upon assessment, it was evident that the current door was beyond repair, necessitating the installation of a new industrial roller shutter door.
After introducing the client to a wide range of industrial roller shutter doors, BGS set to work safely removing the damaged shutters that were deformed, with distorted guide rails, failed motor and a damaged canopy and replacing this with a new tubular motor industrial roller shutter being installed. This approach reduced mechanical complexity, simplified control arrangements, and ensured long-term reliability and maintainability. The selected door configuration provided adequate operational coverage for the opening while reducing the number of moving components and potential failure points. Motor capacity and control specification were matched to duty requirements and site usage. The new installation restored secure access, and the site was handed back in a safe and operational condition.
The works were carried out within a live hospital environment, requiring strict control of access, working practices, and site conduct. Noise, dust, obstruction, and disruption to surrounding operations had to be minimised at all times. The work area needed to be secured safely during removal activities and returned to service promptly.
Strengthening Weather Resilience at Mottisfont Abbey
Project Name: National Trust, Mottisfont Abbey
Location: Romsey, Hampshire
In this project, our group partner, BGS, successfully delivered an installation of an industrial roller shutter door for the National Trust at Mottisfont Abbey in Romsey, Hampshire. The team were originally contacted to survey and assess the condition of their current industrial roller shutter which were a little outdated and ineffective at preventing water ingress. The client required an upgraded, automated solution to improve operational efficient and weather protection.
Upon assessment, it was evident that the current doors were in a poor condition, necessitating the installation of a new industrial roller shutter door. The client required a durable, industrial grade replacement with automatic functionality to eliminate manual handling and overall improve weather resistance ensuring long-term functionality and reliability.
Before completion of the Installation, The National Trust completed works increasing the size of the threshold drain and installed a three phase power supply to support the new doors, as previously these were two issues highlighted upon inspection as points requiring attention. These modifications ensured the site was ready for the replacement.
The BGS team carried out the installation is a safe and efficient manner. The new roller shutters were configured for automatic operation with a “push-to-run” mechanism on the up cycle, providing a more efficient and user-friendly solution.
Industrial Steel Hinged Pedestrian Doors
Custom Steel Fire Exit Doors for £1.5m Padel Centre Refurbishment
Project Name: Padel Shed
Location: Huddlesfield, West Yorkshire
In this project, our group partner, Robust UK, successfully supplied several steel fire exit doors (OUTA-DOR) for a new sports Padel centre, Padel Shed, in Huddersfield, West Yorkshire, as part of a £1.5 million refurbishment project.
Robust UK were approached for the job as the existing doors had corroded and were no longer fit for purpose. The quality of the product alongside the security needs were the perfect choice to meet the needs of the premises and the aesthetic requirement of the new facility. The refurbishment transformed a 45,000 sq ft facility into a modern Padel centre, now home to nine sports courts, a café bar, and flexible spaces for private hire and corporate events. The upgraded venue required high-performance, compliant fire exit solutions to support both safety and design requirements.
A key challenge was achieving a uniform appearance across all doorsets, despite each opening varying slightly in size. Robust UK recommended its OUTA-DOR solution for seven single doorsets and one double doorset, with each unit custom built to exact opening dimensions. This ensured a seamless installation and a consistent, high-quality finish across the site. To support efficient installation, all steel doorsets were delivered fully assembled with pre-fitted hardware, enabling the installation team to complete all eight doorsets within just four days.
All doors were finished in RAL 7016 Anthracite Grey, creating a sleek and uniform appearance. Each doorset was fitted with Briton panic hardware compliant with BS EN 1125, ensuring full fire exit compliance. The two-point locking system secures the door at both the top and bottom, enhancing stability, improving resistance to unauthorised entry, and ensuring reliable operation in emergency situations. Unlike traditional timber doors, the steel construction offers significantly greater durability, with improved resistance to knocks, dents, and heavy use. Manufactured from corrosion-resistant Magnelis® steel, the OUTA-DOR solution provides long-term protection, minimal maintenance requirements, and an anti-corrosion warranty of up to ten years.
Strengthening Whinhill Golf Club Clubhouse Security with SECUR-DOR
Project Name: Whinhill Golf Course
Location: Greenock, Scotland
In this project, our group partner, Robust UK, successfully supplied several heavy duty steel security doors (SECUR-DOR 2.1) to Whinhill Golf Course in Greenock Scotland.
Robust UK manufactured a number of SECUR-DOR 2.1 security doors for installation at their clubhouse. The client required several doors replacing that would ensure an enhanced level of security over a standard perimeter door. SECUR-DOR 2.1 offered fantastic flexibility for this project as it is available certified to both STS 202 BR2 & PAS 24 and is approved by Secured by Design.
As the golf course is so close to the coast, we finished the doors in a C5 marine grade powder coat finish, Ultramarine Blue (RAL 5002). This was to help prolong the lifespan of the door, protecting the metal underneath from the highly corrosive sea air.
Accessible and Compliant Steel Door Solutions for Public Car Parks
Project Name: NCP Car Parks
Location: Bolton, Greater Manchester
In this project, our group partner, Robust UK, successfully supplied 50 steel doors for a variety of applications across two NCP car parks in Bolton. Both heavy duty external doors (OUTA-DOR) and internal steel doorsets with fire rating (INNA-DOR) were the products used for this project. Our wide range of product offerings provided the ability to meet the different specifications needed.
Working with the client, architect and builder, Robust UK supplied 50 steel doors for a variety of applications across the two car parks. Robust UK were specifically chosen to work on this project because of their ability to meet the different specifications needed in a project of this nature.
In public buildings, such as car parks like these, doors must obviously comply with current legislation but special consideration must also be given to the public who are using them. As a result they were able to design and manufacture a range of doors, including supplying some that were designed to assist visually impaired users through the use of strong contrasting colours on the leading edge.
A number of doors were fitted with automatic door operators and had magnetic locks to hold them open until required to close during a fire alarm. A selection of doors were also incorporated into the car park’s access control system. The doors were integrated into the fire protection strategy, and also offered excellent perimeter security.
Hidden Steel Door Solution for a Contemporary Showroom
Project Name: Audi, Tamworth
Location: Tamworth, Staffordshire
In this project, our group partner, Robust UK, successfully supplied both heavy duty external doors (OUTA-DOR) and internal steel doorsets with fire rating (INNA-DOR) for Audi, Tamworth, a car dealership with extensive showroom, office and service facilities.
Working with the client, architect and builder, Robust UK were tasked to maintain the cladding lines on this new showroom as the architect wanted the door to be overclad and ‘hidden,’ within the cladding.
With their expertise and ability to tailor products specifically to an architect’s requirements, they fitted the Robust steel door with specially extended hinges. This meant the perforated cladding material could be fitted to the face of the door to minimise the visible lines of the doors. Standard Robust powder coated steel doors were also supplied.
Fire Shutters
Strengthening Fire Protection Infrastructure at Dame Allan's Schools, Newcastle upon Tyne
Project Name: Dame Allan School
Location: Fenham, Newcastle upon Tyne
In this project, our group partner, BGS, successfully delivered an installation of new fire shutters for Dame Allan’s School, Newcastle upon Tyne. The team were initially called to conduct a comprehensive evaluation of the condition and functionality on their existing roller shutters. The client wanted to establish if the doors were still complaint with current fire safety standards as fire rated doors play a vital role in schools, safeguarding students, staff and visitors by preventing the rapid spread of flames.
During this assessment the team discovered these no longer offered the adequate fire protection. Upgrading or modifying the existing doors was not an option. We recommended replacing the outdated non-compliant shutters with fire-rated shutter doors.
The BGS team took precise measurements to ensure the new doors would fit without the need for structural modifications, alongside working closely with the fabricators to make sure the supplied fire shutters met the required safety standards. Once the new shutters were delivered, the team prepared the site and installed the new doors, ensuring a perfect fit and secure placement before the beginning of the new academic term. After completing all necessary tests and adjustments, the BGS team carried out a detailed handover with a full demonstration of the door’s operation.
Traffic Barriers
Strengthening Site Access at Müller Severnside
Project Name: Müller
Location: Severnside, South Gloucestershire
In this project, our group partner, BGS, successfully delivered an installation of a traffic barrier for Müller at their site in Severnside aimed at improving security, traffic flow and accessibility. The new traffic barriers would need to be easy to operate, clearly situated, and structurally secure.
After introducing the client to a wide range of traffic barriers and confirming the product, the BGS team coordinated closely with the client to make sure that the installation work could be completed at a time that would not be disruptive to everyday business practices.
The installation process was completed using state of the art equipment. Post installation, the BGS team carried out thorough testing on the traffic barriers after installation to make sure they were operating correctly, as well as providing extensive maintenance advice with the client to keep their traffic barrier in the best possible condition.
Long-Term Access Control Solution for EMCOR UK
Project Name: Emcor
Location: High Wycombe, Buckinghamshire
In this project, our group partner, BGS, successfully delivered an installation of a traffic barrier for Emcor at their site in High Wycombe aimed to provide a viable long term and cost-effective solution that would bolster security and help make the barriers more reliable in their day-to-day functionality.
The BGS team were initially tasked with completing an assessment of the existing barriers to identify if these could be repaired. Upon inspection, it was clear the two barriers were in a state of disrepair with snapped boom arm, control faults and damaged loops in the ground lead to a long and effective long-term repair not being possible. After introducing the client to a wide range of traffic barriers and confirming the product, the BGS team coordinated closely with the client to make sure that the installation work could be completed at a time that would not be disruptive to everyday business practices. The BGS team fitted a model that features LED lights for better nighttime visibility and a one-phase asynchronous motor that allows for high-frequency use. We also fitted new safety loops and safety photocells, as well as ensuring that new cables were connected to the gatehouse, granting the guards full control over the barriers. Along with being highly functional, the new barriers also have a sleek modern look, which has improved the appearance of the facility overall.
Post installation, the BGS team carried out thorough testing on the traffic barriers after installation to make sure they were operating correctly, as well as providing extensive maintenance advice with the client to keep their traffic barrier in the best possible condition.
Repairing Corrosion-Damaged Access Control at Yankee Candle
Project Name: Yankee Candle
Location: Yankee Candle Warehouse, United Kingdom
In this project, our group partner, BGS, successfully delivered an installation of a traffic barrier for Yankee Candle at their facility site aimed to provide a viable long term and cost-effective solution that would bolster security and help make the barriers more dependable in their day-to-day functionality.
The main entrance into the Yankee Candle Facility is protected by an electric barrier that serves to regulate access in and out. The barrier had fallen into disrepair with corrosion forming that impacted the integrity and performance, leading to the barrier snapping entirely and collapsing to the ground, rendering this inoperable and impassable. This barrier directly served as the main access point, this needed to be replaced immediately.
After introducing the client to a wide range of traffic barriers and confirming the product, the BGS team coordinated closely with the client to make sure that the installation work could be completed at a time that would not be disruptive to everyday business practices.
Post installation, the BGS team conducted thorough testing on the traffic barriers after installation to make sure they were operating correctly, whilst also making sure that the barrier was set up and balanced correctly. We demonstrated to the customer how to use the barrier and apprised them of any safety features and activation works. We also consulted with the clients on how they wanted the barrier to be configured. This is because it’s possible with this barrier to change how the lights are set up.
Industrial Gates
Delivering Secure Access Solutions for SES Engineering Services
Project Name: SES (Engineering Services)
Location: Spinnigfields, Manchester
In this project, our group partner, BGS, was commissioned by SES (Engineering Services) Ltd, a leading UK-based M&E specialist, to supply and install a new automatic double swing gate system with a personnel gate at the entrance of their facility in Hardman Square, Spinningfields, Manchester. SES required a secure and automated access solution for their site to support the operational demands of a busy facilities hub while meeting safety and access standards.
BGS conducted a pre-installation survey and risk assessment to map out, not only safe working parameters but delivery logistics, due to the site location. All manoeuvres were conducted under controlled conditions, with full safety measures in place to protect the public and ensure compliance. The team installed the automatic double swing gate and personnel access leaf to exact specifications, ensuring full alignment, secure operation, and system integrity. The project was completed with no disruption to local foot traffic and without the need for structural modifications.
After completing all necessary tests and adjustments, the BGS team conducted a detailed handover with a full demonstration of the gate’s operation and maintenance tips.
Restoring Secure Access at Hindpool Retail Park
Project Name: Hindpool Retail Park
Location: Barrow In Furness, Cumbria
In this project, our group partner, BGS, successfully delivered an installation of a new industrial gate for Hindpool Retail Park, Barrow In Furness. The team were initially called to conduct a comprehensive evaluation of the condition and functionality on their existing gate as this had not been in use for many years.
During this assessment, the team discovered the current gate was extremely old and resulting in this being no long safe and functional, with the old gate not being able to pass a force test due to its size and weight, therefore a replacement model was the necessary next step. The new industrial gate would need to be highly functional and safe for everyone on the site to use. While another company had offered a quote to replace the motor, they did not provide advice concerning safety devices, and our BGS team explained to the client that this is not correct to BS Standards. After a thorough consultation process, our team managed to source a brand-new industrial gate for the client that was suitable for their needs. The gate of choice was a Cantilever Gate.
After completing all necessary tests and adjustments, the BGS team conducted a detailed handover with a full demonstration of the gate’s operation and maintenance tips.
Automatic Swing Entrance Doors
A Premier League Standard for Access Solutions: Automated Swing and Sliding Doors at Hill Dickinson Stadium
Project Name: Hill Dickinson Stadium, Everton FC
Location: Liverpool, Merseyside
In this project, our group partner, Horton Automatics, working in partnership with Bennett Architectural, and under the direction of main contractors Laing O’Rourke, supplied and installed a series of state-of-the-art automatic door systems designed to support the functionality, accessibility, and aesthetic quality of this landmark venue.
Set on Liverpool’s historic Bramley-Moore Dock, the Hill Dickinson Stadium is more than just a football ground, it’s a symbol of regeneration and innovation. With a planned capacity of 52,888, it’s poised to become a hub for sport, music, and major cultural events.
Delivering precision and performance at this iconic site, Horton Automatics installed the following products:
- 2021+ Sliding Door Packages – Engineered for high-traffic environments, these doors offer seamless entry and exit for fans and staff alike, combining durability with a sleek design.
- 2x Paired 4100+ Swing Door Automations – Providing controlled access with quiet and reliable operation, these heavy-duty doors are ideal for key internal areas of the stadium.
- 1x Single 4100+ Swing Door Automation – Perfect for smaller access points, this installation ensures consistent performance and safety in more compact areas.
Our team worked to the highest standards, ensuring every installation aligned with the stadium’s cutting-edge infrastructure and future-facing design.
Being part of such a high-profile development is a huge privilege for Horton Automatics. Our contribution helps ensure that this stadium is not only visually striking but also fully equipped for modern accessibility and efficiency.
Automatic Sliding Entrance Doors
Opening the Door to Better Accessibility at Aberystwyth University Students' Union
Project Name: Aberystwyth University Student Union
Location: Aberystwyth, Ceredigion
In this project, our group partner, Horton Automatics, were contracted by LJV Construction to supply and install two Horton 2021+ slimline bi-parting sliding door packages, along with pivoted pocket safety screens and the associated screenwork.
The project pictured below, is the entrance to the Aberystwyth University Student Union Hub – the recognised “Students Organisation” at the University. The hub aims to bring all students together, ensuring they have the best University experience possible, a union led by students, for students.
The finished project resulted in a sleek entrance, allowing for plenty of natural daylight to enter into the building. Due to the exposed location of the University, we specify sliding doors on external entrance, to ensure continual operation and functionality of the doors in adverse weather conditions. This particular entrance is also fitted with in-built electric locking, allowing the doors to work on the University’s card access system outside of normal hours – ensuring accessibility to the building 24-hours a day.
Accessories
Upgrading Yard Access Infrastructure for Veripos
Project Name: Veripos
Location: Aberdeen, Scotland
In this project, our group partner, BGS, was commissioned by Veripos,, to upgrade their yard gate to a more efficient automated model.
The client aimed to modernise their operations by automating their large manually operated yard gate. Recognising the potential for significant improvements in operational efficiency and security, they tasked the BGS team with implementing a solution capable of managing the gate’s substantial size and frequent usage. This project was not merely about replacing a manual system but ensuring seamless integration with the existing infrastructure without compromising performance.
BGS solution involved designing a system incorporating a heavy-duty three-phase (3ph) drive unit alongside an industrial-grade gate rack, selected for their durability and reliability. This configuration was well-suited to the demanding requirements of the site. We conducted a comprehensive site assessment, followed by meticulous planning and installation processes to avoid disrupting the client’s operations. The new automated gate system successfully replaced the manual process, enhancing site security and operational efficiency, and leaving the client fully satisfied.
After completing all necessary tests and adjustments, the BGS team conducted a detailed handover with a full demonstration of the gate’s operation and maintenance tips.